Drainage

  • Comprehensive National Drainage Development Study
  1. Feasibility Studies and Design Consultancy Services for Coastal Protection Works at Blanchisseuse, Matelot, Grande Riviere, San Souci and Toco (28th July 2008 – December 2010.
  2. North Oropouche River Basin Study (22nd May 2008 – November 2010).
  3. Ortoire River Basin Study

 

  • National Programme Upgrade of Drainage Channels: In The Construction Phase
  1. Matura River Improvement Works – Construction of embankments, berms, grading of river and landscaping (11th November 2007 – 11th May 2008).
  2. Alley's Creek River Improvement Works – Construction of 680 m of reinforced concrete walls and 560 m of inverts (14th May 2008 – July 2010).
  3. Camacho Drain La Puerta – Construction of 120 m of reinforced concrete cantilever walls (22nd June 2009 – December 2010).
  4. Dibe River Rehabilitation Works – Construction of 115 m of reinforced concrete cantilever walls (22nd June 2009 – December 2010).

 

  • Flood Mitigation & Erosion Control Programme
  1. Caroni River Improvement Works Phase 2 (Construction phase) – Construction of embankments, berms, and grading of river and landscaping (11th December 2007 – 11th December 2009).

Water Taxi Service